Completed Projects


WILCON CITY CENTER Visayas Avenue, Quezon City

Project Scope: Supply of materials, labor, tools, test equipment, and technical expertise for the following scope of works:
A.HIGH VOLTAGE
First private pole and overhead power line 34.5KV, 3PH.
B.  TRANSFORMER
6-333KVA, 34.5KV-230V, 1PH, DT, pole mounted transformers.
C.FACILITATION WITH MERALCO
D.D.  ELECTRICAL WORKS
    Panelboards, Wires & Cables, Lighting Fixture (Labor Only), Wiring Devices, Conduits, Fittings & Hardware Materials
E.  AUXILIARY WORKS
    Telephone
    CCTV (Roughing-ins Only)
    CATV
    POS (Roughing-ins Only)
    Fire Alarm System
    Sound/Paging System

Date Started:           May 2011Date Completed:      May 2012


CANLUBANG PULP MANUFACTURING CORP. – CANLUBANG, CALAMBA, LAGUNA
Project Scope: 
Conversion of 13.2KV substation to 34.5KV.
Supply of labor,  materials, tools, test equipment, and supervision:
     1. 1Km long of 34.5KV, overhead, Primary Lines
     2. Transformer: 1MVA, 34.5KV-460V Power Transformer,
         3-167KVA, 20KV-460V, 3-100KVA, 20KV-460V.
     3. Facilitate Application with Meralco
     4. Conversion of the existing insulators inside the substation 
         from 13.2KV to 34.5KV
     5. Retirement of existing transformers
Date Started:          July 2009
Date Completed:     February 2010

FOODSPHERE, INC. – 560 West Service Road, Paso de Blas, Valenzuela City
Scope of works:
Supply of labor, tools and equipment for the design and construct of 34.5KV, 3-Phase, Overhead Powerline and Substation for six (6) units of 333kVA, 1-phase, 20KV- 20KV-139/277V, Transformer.
Date Started:         September 2014
Date Completed:     November 2014

ITW AMPANG INDUSTRIES, PHILS.
LIIP, Brgy. Mamplasan, Biñan, Laguna
Project Scope:
     Mechanical Works:
  Design, Supply/install of pipings (waterline,    
       vacuum & air for extrusion machines
     Electrical Works: 
  Design, Supply & install of electrical total system, feeder wires, panelboards,
                 2-150KVA, 460V-230V, dry-type transformer,
Date Started:          December 2009
Date Completed:     February 2010

MASUDA PHILIPPINES – Laguna Technopark, Inc.,
Sta. Rosa, Laguna
Project Scope:
1.Design of 34.5KV, 3Ø, Overhead Power Line
2.Supply of labor, materials, tools, equipment, technical supervision for the installation of first private pole and overhead power line 34.5KV, 3PH.
3.Facilitation with MERALCO.
Date Started:      February, 2012
Date Completed: March, 2012

ACS POULTRY FARMS
Sto. Tomas, Batangas
Developer: ACS Farms
Project Scope: Supply and Install of the following:
     1.  14 Concrete poles, 13.5M height
     2.  9 – 75KVA, 19.9KV-139/277V, pole-mounted transformer
     3.  750 meters overhead 34.5kV primary lines
     4.  First Private Pole (Load Break Switch & Power Fuse)
     5.  24 – distribution panelboards
     6.  Expedited the extension of 6km-Meralco 3 Phase, 34.5KV 
          Primary Lines
Date Started:           June 2008
Date Completed:      August 2008

FORT BONIFACION DEVELOPMENT CORP.
8TH Ave., Fort Bonifacio Global City, Taguig City
(Subcontractor of IPM Construction & Development)
Project Scope: Construction of Underground Power Ductlines & Electrical Manholes (Meralco Standard)
    1.  26 Electrical Manholes
    2.  349 linear meter -10 runs primary duct line
    3.  264 linear meter -14runs primary duct line
    4.  558 linear meter -22 runs primary duct line
    5.  140 linear meter -26 runs primary duct line
    6.  272 linear meter -18 runs lateral duct line
    7.  1  Switchgear Manhole  
Date Started:         March 2009
Date Completed:    February 2010

VELASQUEZ FARMS
Project Scope:  Supply and Install of the following:
     1.  Transformer Vault for 167KVA, 1Phase, 19.9KV-230V, pad-
          mounted transformer
     2.  200m Underground feeder line
     3.  Expedited the approval of this scheme from Meralco
Date Started:          September 2008
Date Completed:     December 2008


PRIMEPOINT RESOURCES CORP. (HATCHERY PLANT)
Brgy. San Juan, Samal, Bataan
Project Scopes:
   1. Design of Building Electrical System
   2. Supply & install of Overhead Distribution Lines.
   3. Supply & install of Loadbreak Switch.
   4. Installation of 2MVA, 13.2kv-230v Power Transformer.
   5. Installation of Feeder Lines from Transformer to ATS to
       Synchronizing Panel to Genset
Date Started:          November  21, 2013
Date Completed:     July 2014

VASSAR INDUSTRIES, INC.
San Pedro Laguna
Project Scope: Upgrading of Electrical System
Date Started:           October 2013
Date Completed:      December 2013

YAZAKI-TORRES
Brgy. Makiling, Calamba, Laguna
Project Scope:
      1. Reconditioning of First Private Pole
      2. Installation of Overhead Lines
      3. Construction/Installation of
          Perimeter Fence (Cyclone)
      4. Installation of Cable Ladder from
          Transformer to ATS at EE Room
Date Started:           March 21, 2014
Date Completed:      October 2014

HIDDEN V. RESORT – CARMELRAY INDUSTRIAL PARK, CANLUBANG, CALAMBA CITY
Project Scope:
Supply of labor and materials for:
1.The installation of 7.62KV, 1Ø overhead power line.
2.The supply of 50KVA, 230V-7.62KV, 1Ø, step-up & 50KVA, 7.62KV-230V, 1Ø, step-down transformers.
3.Facilitation with Meralco.
Date Started:       January 2011
Date Completed:   February 2011

ZAMA - (FPIP-II)
Brgy. Sta. Anastacia, Sto. Tomas, Batangas
Supply of labor, tools and equipment for the installation of temporary power supply.
Date Started:         July 2014
Date Completed:    December 2014

SHIN-ETSU PHILIPPINES CORPORATION
Laguna Technopark, Biñan, Laguna
Project Scope: Supply of labor, tools, equipment,  technical supervision for the installation of 34.5KV First Private Pole.
Date Started:           April 19, 2011
Date Completed:      April 23, 2011

ALASKA MILK CORPORATION – SAN PEDRO, LAGUNA
Project Scope:
Supply of labor and materials for:
1. Relocation of overhead distribution line.
2. Relocation of six (6) 333kva pole mounted transformer.
Date Started:         December 26, 2014
Date Completed:    December 30, 2014

FIRST PHILIPPINE INDUSTRIAL PARK
Utility Service Connection, Lot 33B Ph. 1B
Sto. Tomas, Batangas
Project Scope: Supply of Labor and Materials for the
construction of Underground Power line, water line,
drainage line.
Date Started:           May 2009
Date Completed:      August 2009

SHIN-ETSU PHILIPPINES CORPORATION
Laguna Technopark, Biñan, Laguna
Project Scope: Maintenance of First Private Pole.
Date Started:           April 21, 2011
Date Completed:      April 22, 2011

FIRST PHILIPPINE INDUSTRIAL PARK - 2
Sta. Anastacia, Sto. Tomas, Batangas
Project Scope:
Electrical Works – Supply of labor, tools, equipment & materials for the installation of Main Distribution Panel and Busbar Gutter.
Date Started:           November 2013
Date Completed:      December 2013

F-TECH PHILIPPINES – Laguna Technopark, Biñan, Laguna
Project Scope: Supply of labor, tools & consumables for the following scope:
1.Installation of Concrete Pedestal (High Voltage Entrance).
2.Installation of Transformer Pad and Primary Conduits.
3.Installation of Secondary Conduits.
4.Installation of Cyclone Wire Perimeter Fence.
Date Started:         January, 2013
Date Completed:         March, 2013

WILCON BUILDER’S DEPOT
Calamba City, Laguna
Project Scope: Supply of labor, tools, equipment,  technical supervision, & facilitation with Meralco for the installation
of electrical wiring system, fire alarm system, telephone
cabling & auxiliary system.
Date Started:           March 2009
Date Completed:      July 2009

WILCON BUILDER’S DEPOT, INC. – Batangas City
Project Scope:
1. Design of Electrical System.
2. Supply of labor, tools, equipment,  technical supervision.
3. Facilitation with Meralco for the installation of electrical wiring system.
Date Started:                 August 25, 2009
Date Completed:            November 2009

WILCON BUILDER’S DEPOT
Alimall, Cubao, Quezon City
Project Scope: Supply of labor, tools, equipment,  technical supervision, & facilitation with Meralco
For the installation of electrical wiring system.
Date Started:            September 23, 2009
Date Completed:       January 2010


WILCON BUILDER’S DEPOT, INC. – Libis, Quezon City
Project Scope: Supply of labor, tools, materials, equipment, technical supervision for Upgrading of Electrical System (Labor Only)
Date Started:         May 2010
Date Completed:    June 2010

WILCON BUILDER’S DEPOT, INC.
Marcos Highway, Antipolo Rizal
Project Scope:
1.Supply of  low voltage switchgear, panelboards, busbar gutter, wire gutter.
2.Supply of labor, tools, equipment,  technical supervision, & facilitation with MERALCO for the installation of electrical wiring system.
Date Started:           May 2010
Date Completed:      October 2010


WILCON BUILDER’S DEPOT, INC. – Dasmariñas, Cavite
Project Scope:
1.Design of electrical system.
2.Supply of  Low Voltage Switchgear, Automatic Transfer Switch, panelboards & wire gutters.
3.Supply of labor, tools, equipment, technical supervision, & facilitation with MERALCO for the installation of electrical system.

Date Started:         December, 2010
Date Completed:     January 2011

WILCON BUILDER’S DEPOT, INC. – Talisay, Cebu
Project Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Lightings System.
3.Installation of Power System.
4.Installation of Telephone System.
5.Installation of POS System.
6.Installation of BGM System.

Date Started:         May, 2012
Date Completed:     June 2012

WILCON BUILDER’S DEPOT, INC. – Mandaue, Cebu
Project Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Lightings System.
3.Installation of Power System.
4.Installation of Telephone System.
5.Installation of POS System.
6.Installation of BGM System.

Date Started:         September, 2012
Date Completed:    October 2012

WILCON BUILDER’S DEPOT, INC. – Kawit, Cavite
Project Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Lightings System.
3.Installation of Power System.
4.Installation of Telephone System.
5.Installation of POS System.
6.Installation of BGM System.
Date Started:         December, 2012
Date Completed:    January 2013

WILCON BUILDER’S DEPOT, INC. – Libis 5th Floor, Quezon City
Project Scope: Renovation at 5th Floor. Supply of labor, tools, equipment and consumables for the following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Installation of wire ways, conduit pipes and fittings.
4.Installation of hangers and support
5.Installation of fire detection alarm system
6.Installation of telephone and data lines
7.Wiring and termination of devices
8.Testing and commissioning
Date Started:         March 2013
Date Completed:    May 2013

WILCON CORAL – High Voltage, Teresa Rizal
Project Scope: Supply of labor, tools, materials, equipment and consumables of the following scope of works.
1.Mobilization / demobilization
2.Engineering and technical supervision
3.Tapping at existing overhead distribution line at Coral 3
4.Installation of concrete and steel poles
5.Pole dressing and stringing of wires
6.Installation of 3-167kva, 1Ø, 20kv-139/277v, pole mounted transformer
7.Installation of secondary wires from transformer
     poles to existing service entrance at Coral 1
8.Testing & commissioning.
Date   :         July 19, 2013

WILCON CORAL – Coral Farm, Teresa Rizal
Project Scope: Supply of materials, labor & technical supervision for following electrical works.
1. Design and estimate.
2. Supply of panelboards and motor control centers.
3. Supply of Dry Type Tranformers.
4. Feeder line for motor load at fermentation plant.
5. Underground feeder line for motor loads process tanks.
6. Testing & commissioning.
Date   :         July 19, 2013

PHILDOMUS INCORPORATED – PILA TOWN HOMES, PILA LAGUNA
Project Scope:
1.Design of electrical system for the power supply 25Hp water pump.
2.Supply & Install of Service Entrance & secondary underground feeder line
3.Supply of panelboard.
Date:  May 2008
Project Cost:         P 650,000.00
BANCO DE ORO BRANCH OFFICE
San Pablo City, Laguna
Project Scope:
      1. Installation of Service Entrance
          and Main Circuit Breaker
      2. Expedited with Meralco the early completion of
          the project.
Date Started:            October 2008
Date Completed:       October 2008

KEWALRAM PHILIPPINES
Bgy. Turbina, Calamba City, Laguna
Project Scope: Conversion from Primary Metering to Secondary Metering. Supply and Install of the following: 
     1.  Service Entrance 230V
     2.  Paneboard
     3.  Secondary overhead feeder line
Date Started:             November 2008
Date Completed:        December 2008

CASA DE NIPA  (LOCSIN)  – CanlubangCalamba, Laguna
Project Scope: Supply of Labor and Materials for:
1.Design of medium voltage overhead power lines.
2.Installation of 13.8KV overhead lines.
3.Installation of 6-75KVA, 13.8KV-230V Pole Mounted Transformer.
Date Started:     July 2009
Date Completed:            August 2009

BANCO DE ORO
Batangas City, Batangas
Project Scope: Supply of Labor and Materials for:
the construction of Meter Base.
installation of Main Circuit Breaker, Busbar Gutter, Submeters  and Wire Gutter.
Date Started:                 February 2010
Date Completed:            February 2010

WALL VISION CORPORATION – UPS IV, Parañaque, Metro Manila
Project Scope:  Installation of Service Entrance
Date:                    April 2010

UNI-PLASTIC INTERNATIONAL CORPORATION – Paciano Rizal, Calamba, Laguna
Project Scope:  Construction of Service Entrance & Installation of Electrical System
Date Started:             May 2010
Date Completed:        July 2010

THUNDERBIRD RESORT – Binangonan, Rizal
Project Scope: Construction of Concrete Pedestal & Transformer Pad; duct trench for looping of  Transformer 1 to Transformer 2.
Date Started:            September 2010
Date Completed:       November 2010

LRT BUILDERS, INC.
Bagbaguin, Sta. Maria, Bulacan
Project Scope: Supply of Labor and materials for feeder line from service entrance to new electrical room and panelboards.
Date Started:             September 2010
Date Completed:        January 2011

PHILIPPINE PRECISION TECHNOLOGY, INC.
Carmelray Industrial Park, Canlubang, Calamba City, Laguna
Project Scope: Installation of Main Circuit Breaker and Automatic Transfer Switch.
Date:                   March 2011

PHILIPPINE SPRING WATER RESOURCES, INC.-
Carmelray Industrial Park, Canlubang, Calamba City, Laguna
Project Scope: Maintenance of First Private Pole.
Date:                   April 2011

METALS ENGINEERING RESOURCES CORPORATION – LISP-3, Sto. Tomas, Batangas
Project Scope:  Supply of labor, tools, materials, equipment, technical supervision & facilitation with Meralco for the installation of electrical system.
Primary metering, 34.5KV, 3Phase, 1.5MVA Substation
Date:           September, 2011

FILIPINO BUILDING – Bolaños Cor., De La Rosa St., Makati City
Project Scope:
1.Design of outdoor substation/ meter center.
2.Construction of outdoor transformer vault.
3.Construction of meter center.
4.Supply and install of MCB, 2000AT, 3P, 230V, Free Standing.
5.Supply and install of 14-Manual Transfer Switch.
6.Supply and install of busbar/ wire gutter.
7.Re-wiring of feeder lines.
8.Facilitate application to Meralco.
Date Started  :         November 5, 2011

IKK ICHIGAN – Cabuyao, Laguna
Project Scope:
1.Supply of labor and materials for the construction of 1MVA Substation.
2.Supply and install of MCB, 2000AT, 3P, 230V, Free Standing.
3.Supply and install of Panelboards.
Date   :         December 31, 2011


CP PHILIPPINES – Jaen, Nueva Ecija
Project Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Transformer and Fence.
3.Installation of ATS, Panelboards and Wire Ways.
4.Installation of Lightings System.
5.Installation of Power System.
6.Installation of Overhead Line (High Voltage).
Date :         November, 2012

SHIN-ETSU PHILIPPINES CORPORATION - Laguna Technopark, Biñan, Laguna
Project Scope: Supply of labor, tools, equipment,  technical supervision for the following scope of works:
1.Replacement of 3 units of lightning arrester at Plant 1.
2.Preventive maintenance of First Private Pole of Plant 1.
3.Preventive maintenance of First Private Pole of Plant 3.
Date Started:             March 1, 2013
Date Completed:        March 1, 2013

WILCON BUILDER’S DEPOT, INC. – Las Piñas
Project Scope: Supply of labor, consumables & equipment for the following electrical works.
1. Depot extension
2. Renovation of showroom
3. Relocation of offices & customers CR
4. Relocation of Tenants
5. Main entrance main information center
6. DIY general lightings
Date   :         February 2012 - December, 2013

WILCON BUILDER’S DEPOT, INC. – Montalban, Rizal
Project Scope: Supply of labor, tools & consumables for the following scope of works:
1.Electrical design.
2.Upgrade of existing feeder line.
3.Installation of Main Circuit Breakers, Busbar Gutter & Distribution Panel.
Date:           May, 2012

WILCON BUILDER’S DEPOT, INC. – Mindanao (Base 6)
Project Scope: Rehabilitation of main circuit breaker and feeder wires at ATS. Supply of labor, tools, equipment and consumables for the following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Dismantling of existing MCB panel
4.Installation of new MDP panel
5.Installation of conduit pipes form MDP (located at concrete pedestal) to ATS (inside store).
6.Installation of feeder wires from MDP to ATS
7.Tapping of ACCU feeder wires to MDP branch circuit
8.Testing and commissioning.
Date Started:           February 2013

WILCON BUILDER’S DEPOT, INC. – Baliuag, Bulacan
Project Scope: Supply of  low voltage switchgear, automatic transfer switch, panelboards,
busbar/wire gutter

WILCON BUILDER’S DEPOT, INC. – Libis 4th Floor, Quezon City
Project Scope: Supply of labor, tools, equipment and consumables for the following scope of works:
1.Mobilization / demobilization
2.Engineering and technical supervision
3.Dismantling of existing power and lighting layouts
4.Installation of power and lightings for maintenance office.
5.Installation of lightings at free area
6.Installation of wire ways for maintenance office feeder line
7.Testing and commissioning
Date Started:           March 2013

WILCON BUILDER’S DEPOT, INC. – Alimall, Cubao, Quezon City
Project Scope: Renovation at DIY – Electrical Works. Supply of labor, tools, equipment and consumables for the following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Electrical works:
3.1. Dismantling works of tubular, hanger & supports, T8 lights-36W & 3.5mm² THHN copper
3.2. General lightings, Philips and Ariston modules
3.3. Testing and commissioning
3.4. As-built plan
Date Started:           June 2013

WILCON BUILDER’S DEPOT, INC. – Halang, Calamba, Laguna
Project Scope: D.I.Y Renovation
Date Started:           June, 2013

WILCON BUILDER’S DEPOT, INC. – Filinvest, Alabang Muntinlupa
Project Scope: Renovation – Electrical Works. Supply of labor, tools, equipment and consumables for the following works:
1.Mobilization / demobilization.
2.Technical supervision.
3.Electrical works:
3.1. Relocation of chandelier
3.2. Replacement of racking lights
3.3. Appliance center
3.4. As-built plan
Date Started:           June 2013

WILCON BUILDER’S DEPOT, INC. – WTB Mansion
Project Scope: Electrical at Main House. Supply of labor, tools and consumables for the following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Electrical works:
3.1. Dismantle and replacement of lighting fixture
3.2. Dismantle and replacement of switches & convenience outlets
3.3. Testing and power-up fire alarm system
3.4. Inspection and testing of CATV system and basement, recreation area, gazebo area, second floor and attic
3.5. Dismantle of feeder wires for ACCU unit, guest house and office
3.6. Dismantle of path lights and re-tracing of existing wires
3.7. Dismantle of wires  of 2 – generator set at basement area
3.8. Testing and commissioning
3.9. As-built plan
Date Started:           July 2013

WILCON BUILDER’S DEPOT, INC. – HOME ESSENTIAL (Sta. Mesa, Piña Avenue)
Supply of labor, tools, equipment and consumables for the following scope of works:
1.Mobilization/ demobilization.
2.Engineering & Technical Supervision
3.Electrical works:
A.Service Entrance Feeder and Sub Feeder
B.Painting Works For Feeder & Sub Feeder
C.Lighting Layout For Showrooms, Admin Office, CCTV
D.Power Layout For Showrooms, Admin Office, CCTV
E.Installation of Vertical Support At First Floor
F.Installation of Wireway At First Floor
G.Installation of Vertical Support for Lighting Fixture at First Floor
H.Installation of Horizontal & Vertical Support at Second Floor
I.Installation of Wireway at Second Floor
J.Installation of Vertical Support For Lighting Fixture at Second Floor
K.Roughing-ins For Racking, Ads Frame and Build-up Letter
Date Started:           July 2013


WILCON BUILDER’S DEPOT, INC. – Batangas City
Project Scope: Supply of labor, equipment, consumables & technical supervision for the following scope of works
1.Mobilization / demobilization.
2.Roughing-ins at Training Module, Sanitary Showroom, Service Fascia, Tenants Display, Sales Area, Releasing Area, Customer Area and Training Area.
3.Wiring Lay-out at Training Module, Sanitary Showroom, Service Fascia, Tenants Display, Sales Area, Releasing Area, Customer Area and Training Area.
4.Installation of Wiring Devices at Sales Area, Releasing Area and Customer Service Area.
5.Installation of Lightings at Training Modules, Sanitary Showroom, Service Fascia, Tenants Display Area and Trading Area
6.Dismantling Works for Existing C.O. Wires and Conduits at Sales Area, Releasing & Customer Service Area
7.Dismantling Works for Existing High Bay Lights with chain supports at Trading Area.
8.Testing and commissioning
Date Started:           October 2013


CASA DE NIPA (LOCSIN RESIDENCE) – Brgy. Canlubang, Calamba City, Laguna
Project Scope: Supply of labor, equipment, consumables & technical supervision for the restoration of power utilities.
Date Started:         July 2014

Contact us:

Email add: rhinotechcorp@gmail.com
Telephone No: (049) 508-0755

CP: 0917-5917-136