WILCON
CITY
CENTER Visayas
Avenue, Quezon City
Project Scope: Supply
of materials, labor, tools, test equipment, and technical expertise for the
following scope of works:
A.HIGH
VOLTAGE
•First private pole and overhead
power line 34.5KV, 3PH.
B. TRANSFORMER
•6-333KVA, 34.5KV-230V, 1PH, DT,
pole mounted transformers.
C.FACILITATION
WITH MERALCO
D.D. ELECTRICAL WORKS
•
Panelboards,
Wires & Cables,
Lighting
Fixture (Labor Only), Wiring
Devices,
Conduits,
Fittings & Hardware Materials
E. AUXILIARY WORKS
•
Telephone
•
CCTV (Roughing-ins Only)
•
CATV
•
POS (Roughing-ins Only)
•
Fire Alarm System
•
Sound/Paging System
Date Started: May 2011Date Completed: May 2012
CANLUBANG
PULP MANUFACTURING CORP. – CANLUBANG, CALAMBA, LAGUNA
Project
Scope:
Conversion
of 13.2KV substation to 34.5KV.
Supply
of labor, materials, tools, test
equipment, and supervision:
1. 1Km long of 34.5KV, overhead, Primary
Lines
2. Transformer: 1MVA, 34.5KV-460V Power
Transformer,
3-167KVA, 20KV-460V, 3-100KVA,
20KV-460V.
3. Facilitate Application with Meralco
4. Conversion of the existing insulators
inside the substation
from 13.2KV to 34.5KV
5. Retirement of existing transformers
Date
Started: July
2009
Date
Completed: February
2010
FOODSPHERE,
INC. – 560 West Service Road, Paso de Blas, Valenzuela City
Scope
of works:
Supply
of labor, tools and equipment for the design and construct of 34.5KV, 3-Phase,
Overhead Powerline and
Substation for six (6) units of 333kVA, 1-phase, 20KV- 20KV-139/277V,
Transformer.
Date
Started: September
2014
Date Completed: November 2014
ITW
AMPANG INDUSTRIES, PHILS.
LIIP,
Brgy.
Mamplasan,
Biñan,
Laguna
Project
Scope:
Mechanical Works:
Design, Supply/install of pipings
(waterline,
vacuum
& air for extrusion machines
Electrical Works:
Design, Supply &
install of electrical total system, feeder wires, panelboards,
2-150KVA,
460V-230V, dry-type
transformer,
Date Started: December
2009
Date
Completed: February
2010
MASUDA
PHILIPPINES – Laguna Technopark,
Inc.,
Sta.
Rosa, Laguna
Project
Scope:
1.Design
of 34.5KV, 3Ø, Overhead Power Line
2.Supply
of labor, materials, tools, equipment, technical supervision for the
installation of first private pole and overhead power line 34.5KV, 3PH.
3.Facilitation
with MERALCO.
Date
Started: February,
2012
Date
Completed: March,
2012
ACS
POULTRY FARMS
Sto.
Tomas, Batangas
Developer: ACS
Farms
Project
Scope: Supply and Install of the following:
1.
14 Concrete poles, 13.5M height
2.
9 – 75KVA, 19.9KV-139/277V, pole-mounted transformer
3.
750 meters overhead 34.5kV primary lines
4.
First Private Pole (Load Break Switch & Power Fuse)
5.
24 – distribution panelboards
6.
Expedited the extension of 6km-Meralco 3 Phase, 34.5KV
Primary Lines
Date
Started: June
2008
Date
Completed: August
2008
FORT
BONIFACION DEVELOPMENT CORP.
8TH
Ave., Fort Bonifacio
Global City, Taguig
City
(Subcontractor
of IPM Construction & Development)
Project
Scope: Construction of Underground Power Ductlines
& Electrical Manholes (Meralco
Standard)
1. 26 Electrical Manholes
2. 349 linear meter -10 runs
primary duct line
3. 264 linear meter -14runs
primary duct line
4. 558 linear meter -22 runs
primary duct line
5. 140 linear meter -26 runs
primary duct line
6. 272 linear meter -18 runs
lateral duct line
7. 1 Switchgear Manhole
Date
Started: March
2009
Date
Completed: February
2010
VELASQUEZ
FARMS
Project
Scope: Supply and Install of the following:
1.
Transformer Vault for 167KVA, 1Phase, 19.9KV-230V, pad-
mounted transformer
2.
200m Underground feeder line
3.
Expedited the approval of this scheme from Meralco
Date
Started: September
2008
Date
Completed: December
2008
PRIMEPOINT
RESOURCES CORP. (HATCHERY PLANT)
Brgy.
San Juan, Samal,
Bataan
Project
Scopes:
1. Design of Building Electrical System
2. Supply & install of Overhead
Distribution Lines.
3. Supply & install of Loadbreak
Switch.
4. Installation of 2MVA, 13.2kv-230v Power
Transformer.
5. Installation of Feeder Lines from
Transformer to ATS to
Synchronizing Panel to Genset
Date
Started: November
21, 2013
Date
Completed: July 2014
VASSAR
INDUSTRIES, INC.
San Pedro Laguna
Project
Scope:
Upgrading
of Electrical System
Date
Started: October 2013
Date
Completed: December 2013
YAZAKI-TORRES
Brgy.
Makiling,
Calamba,
Laguna
Project
Scope:
1. Reconditioning of First Private Pole
2. Installation of Overhead Lines
3. Construction/Installation of
Perimeter Fence (Cyclone)
4. Installation of Cable Ladder from
Transformer to ATS at EE Room
Date
Started: March 21, 2014
Date
Completed: October 2014
HIDDEN
V. RESORT – CARMELRAY INDUSTRIAL PARK, CANLUBANG, CALAMBA CITY
Project Scope:
Supply of labor and materials for:
1.The
installation of 7.62KV, 1Ø overhead power line.
2.The
supply of 50KVA, 230V-7.62KV, 1Ø, step-up & 50KVA, 7.62KV-230V, 1Ø,
step-down transformers.
3.Facilitation
with Meralco.
Date Started: January 2011
Date Completed: February 2011
ZAMA
- (FPIP-II)
Brgy.
Sta. Anastacia,
Sto.
Tomas, Batangas
Supply
of labor, tools and equipment for the installation of temporary
power supply.
Date Started: July
2014
Date
Completed: December 2014
SHIN-ETSU
PHILIPPINES CORPORATION
Laguna
Technopark,
Biñan,
Laguna
Project Scope:
Supply
of labor, tools, equipment, technical
supervision for the installation of 34.5KV First Private Pole.
Date
Started: April 19, 2011
Date
Completed: April 23, 2011
ALASKA
MILK CORPORATION – SAN PEDRO, LAGUNA
Project Scope:
Supply of labor and materials for:
1.
Relocation of overhead distribution line.
2.
Relocation of six (6) 333kva pole mounted transformer.
Date Started: December 26, 2014
Date
Completed: December 30, 2014
FIRST
PHILIPPINE INDUSTRIAL PARK
Utility
Service Connection, Lot 33B Ph. 1B
Sto.
Tomas, Batangas
Project
Scope:
Supply of Labor and Materials for the
construction
of Underground Power line, water line,
drainage
line.
Date
Started: May 2009
Date
Completed: August 2009
SHIN-ETSU
PHILIPPINES CORPORATION
Laguna
Technopark,
Biñan,
Laguna
Project Scope:
Maintenance
of First Private Pole.
Date
Started: April 21, 2011
Date
Completed: April 22, 2011
FIRST
PHILIPPINE INDUSTRIAL PARK - 2
Sta. Anastacia, Sto. Tomas, Batangas
Project
Scope:
Electrical
Works – Supply of labor, tools, equipment & materials for the installation
of Main Distribution Panel and Busbar
Gutter.
Date
Started: November
2013
Date
Completed: December 2013
F-TECH
PHILIPPINES – Laguna Technopark, Biñan,
Laguna
Project Scope: Supply of labor, tools &
consumables for the following scope:
1.Installation
of Concrete Pedestal (High Voltage Entrance).
2.Installation
of Transformer Pad and Primary Conduits.
3.Installation
of Secondary Conduits.
4.Installation
of Cyclone Wire Perimeter Fence.
Date Started: January,
2013
Date Completed: March, 2013
WILCON BUILDER’S DEPOT
Calamba
City, Laguna
Project Scope:
Supply
of labor, tools, equipment, technical
supervision, & facilitation with Meralco
for the installation
of
electrical wiring system, fire alarm system, telephone
cabling
& auxiliary system.
Date
Started:
March
2009
Date
Completed: July
2009
WILCON BUILDER’S DEPOT, INC. – Batangas
City
Project
Scope:
1.
Design of Electrical System.
2.
Supply of labor, tools, equipment,
technical supervision.
3.
Facilitation with Meralco
for the installation of electrical wiring system.
Date
Started: August 25, 2009
Date
Completed: November
2009
WILCON BUILDER’S DEPOT
Alimall,
Cubao,
Quezon City
Project
Scope:
Supply of labor, tools, equipment,
technical supervision, & facilitation with Meralco
For
the installation of electrical wiring system.
Date
Started: September
23, 2009
Date
Completed: January
2010
WILCON BUILDER’S DEPOT, INC. – Libis,
Quezon City
Project
Scope:
Supply of labor, tools, materials, equipment, technical supervision for
Upgrading of Electrical System (Labor Only)
Date
Started: May 2010
Date Completed: June 2010
WILCON BUILDER’S DEPOT, INC.
Marcos Highway, Antipolo
Rizal
Project
Scope:
1.Supply of low voltage switchgear, panelboards,
busbar
gutter, wire gutter.
2.Supply of labor, tools,
equipment, technical supervision, &
facilitation with MERALCO for the installation of electrical wiring system.
Date
Started: May 2010
Date
Completed: October 2010
WILCON BUILDER’S
DEPOT, INC. – Dasmariñas, Cavite
Project
Scope:
1.Design of electrical system.
2.Supply of Low Voltage Switchgear, Automatic Transfer
Switch, panelboards
& wire gutters.
3.Supply of labor, tools, equipment,
technical supervision, & facilitation with MERALCO for the installation of
electrical system.
Date
Started: December, 2010
Date Completed: January 2011
WILCON BUILDER’S DEPOT, INC. – Talisay,
Cebu
Project
Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Lightings System.
3.Installation of Power System.
4.Installation of Telephone System.
5.Installation of POS System.
6.Installation of BGM System.
Date
Started: May, 2012
Date Completed: June 2012
WILCON BUILDER’S DEPOT, INC. – Mandaue,
Cebu
Project
Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Lightings System.
3.Installation of Power System.
4.Installation of Telephone System.
5.Installation of POS System.
6.Installation of BGM System.
Date
Started: September, 2012
Date Completed: October 2012
WILCON BUILDER’S DEPOT, INC. – Kawit,
Cavite
Project
Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Lightings System.
3.Installation of Power System.
4.Installation of Telephone System.
5.Installation of POS System.
6.Installation of BGM System.
Date
Started: December, 2012
Date Completed: January 2013
WILCON BUILDER’S DEPOT, INC. – Libis
5th Floor, Quezon
City
Project
Scope:
Renovation at 5th
Floor. Supply of labor, tools, equipment and consumables for the following
works:
1.Mobilization / demobilization.
2.Engineering & technical
supervision.
3.Installation of wire ways, conduit
pipes and fittings.
4.Installation of hangers and support
5.Installation of fire detection
alarm system
6.Installation of telephone and data
lines
7.Wiring and termination of devices
8.Testing and commissioning
Date
Started: March 2013
Date Completed: May 2013
WILCON CORAL
– High Voltage, Teresa Rizal
Project
Scope:
Supply of
labor, tools, materials, equipment and consumables of the following scope of
works.
1.Mobilization
/ demobilization
2.Engineering
and technical supervision
3.Tapping
at existing overhead distribution line at Coral 3
4.Installation
of concrete and steel poles
5.Pole
dressing and stringing of wires
6.Installation
of 3-167kva, 1Ø, 20kv-139/277v, pole mounted transformer
7.Installation
of secondary wires from transformer
poles to existing service entrance at
Coral 1
8.Testing
&
commissioning.
Date
:
July
19, 2013
WILCON CORAL
– Coral Farm, Teresa Rizal
Project
Scope:
Supply of materials, labor & technical supervision for following electrical
works.
1.
Design and estimate.
2.
Supply of panelboards
and motor control centers.
3.
Supply of Dry Type Tranformers.
4.
Feeder line for motor load at fermentation plant.
5.
Underground feeder line for motor loads process tanks.
6.
Testing & commissioning.
Date
:
July
19, 2013
PHILDOMUS
INCORPORATED
– PILA TOWN HOMES, PILA LAGUNA
Project Scope:
1.Design
of electrical system for the power supply 25Hp water pump.
2.Supply
& Install of Service Entrance & secondary underground feeder line
3.Supply
of panelboard.
Date: May 2008
Project Cost: P 650,000.00
BANCO
DE
ORO BRANCH OFFICE
San
Pablo City, Laguna
Project
Scope:
1. Installation of Service Entrance
and Main Circuit Breaker
2. Expedited with Meralco
the early completion of
the project.
Date
Started: October
2008
Date
Completed: October
2008
KEWALRAM
PHILIPPINES
Bgy.
Turbina,
Calamba
City, Laguna
Project
Scope: Conversion from Primary Metering to Secondary Metering. Supply and
Install of the following:
1.
Service Entrance 230V
2. Paneboard
3.
Secondary overhead feeder line
Date
Started: November
2008
Date
Completed: December
2008
CASA DE
NIPA (LOCSIN) – Canlubang, Calamba,
Laguna
Project Scope: Supply of Labor and
Materials for:
1.Design
of medium voltage overhead power lines.
2.Installation
of 13.8KV overhead lines.
3.Installation
of 6-75KVA, 13.8KV-230V Pole Mounted Transformer.
Date Started: July 2009
Date Completed: August
2009
BANCO
DE ORO
Batangas
City, Batangas
Project
Scope: Supply of Labor and Materials for:
the
construction of Meter Base.
installation
of Main Circuit Breaker, Busbar
Gutter, Submeters and Wire Gutter.
Date
Started: February
2010
Date
Completed: February
2010
WALL
VISION CORPORATION – UPS IV, Parañaque,
Metro Manila
Project Scope: Installation of Service Entrance
Date: April
2010
UNI-PLASTIC
INTERNATIONAL
CORPORATION – Paciano
Rizal, Calamba,
Laguna
Project Scope: Construction of Service Entrance &
Installation of Electrical System
Date Started: May
2010
Date Completed: July
2010
THUNDERBIRD
RESORT – Binangonan,
Rizal
Project
Scope: Construction of Concrete Pedestal & Transformer Pad; duct trench for
looping of Transformer 1 to Transformer
2.
Date
Started: September
2010
Date
Completed: November
2010
LRT
BUILDERS,
INC.
Bagbaguin,
Sta. Maria, Bulacan
Project
Scope: Supply of Labor and materials for feeder line from service entrance to
new electrical room and panelboards.
Date
Started: September
2010
Date
Completed: January
2011
PHILIPPINE
PRECISION
TECHNOLOGY, INC.
Carmelray
Industrial Park, Canlubang,
Calamba
City, Laguna
Project
Scope: Installation of Main Circuit Breaker and Automatic Transfer Switch.
Date: March
2011
PHILIPPINE
SPRING WATER RESOURCES, INC.-
Carmelray
Industrial Park, Canlubang,
Calamba
City, Laguna
Project
Scope: Maintenance of First Private Pole.
Date: April
2011
METALS
ENGINEERING RESOURCES CORPORATION – LISP-3, Sto.
Tomas, Batangas
Project
Scope: Supply of labor, tools,
materials, equipment, technical supervision & facilitation with Meralco for
the installation of electrical system.
Primary
metering, 34.5KV, 3Phase, 1.5MVA Substation
Date: September,
2011
FILIPINO
BUILDING
– Bolaños
Cor., De La Rosa St., Makati City
Project
Scope:
1.Design of outdoor substation/ meter
center.
2.Construction of outdoor transformer
vault.
3.Construction of meter center.
4.Supply and install of MCB, 2000AT, 3P,
230V, Free Standing.
5.Supply and install of 14-Manual Transfer
Switch.
6.Supply and install of busbar/
wire gutter.
7.Re-wiring of feeder lines.
8.Facilitate application to Meralco.
Date
Started : November
5, 2011
IKK ICHIGAN
– Cabuyao,
Laguna
Project Scope:
1.Supply
of labor and materials for the construction of 1MVA Substation.
2.Supply
and install of MCB, 2000AT, 3P, 230V, Free Standing.
3.Supply
and install of Panelboards.
Date : December 31, 2011
CP
PHILIPPINES
– Jaen,
Nueva Ecija
Project
Scope: Supply of labor, tools & consumables for the following scope:
1.Electrical Systems Design.
2.Installation of Transformer and Fence.
3.Installation of ATS, Panelboards and
Wire Ways.
4.Installation of Lightings System.
5.Installation of Power System.
6.Installation of Overhead Line (High
Voltage).
Date : November,
2012
SHIN-ETSU
PHILIPPINES CORPORATION - Laguna Technopark,
Biñan,
Laguna
Project
Scope: Supply
of labor, tools, equipment, technical
supervision for the following scope of works:
1.Replacement
of 3 units of lightning arrester at Plant 1.
2.Preventive
maintenance of First Private Pole of Plant 1.
3.Preventive
maintenance of First Private Pole of Plant 3.
Date
Started: March
1, 2013
Date
Completed: March
1, 2013
WILCON
BUILDER’S
DEPOT, INC. – Las Piñas
Project
Scope: Supply of labor, consumables & equipment for the following
electrical works.
1.
Depot extension
2.
Renovation of showroom
3.
Relocation of offices & customers CR
4.
Relocation of Tenants
5.
Main entrance main information center
6.
DIY general lightings
Date : February
2012 - December, 2013
WILCON
BUILDER’S
DEPOT, INC. – Montalban,
Rizal
Project
Scope: Supply of labor, tools & consumables for
the following scope of works:
1.Electrical design.
2.Upgrade of existing feeder line.
3.Installation of Main Circuit Breakers, Busbar
Gutter & Distribution Panel.
Date: May,
2012
WILCON
BUILDER’S
DEPOT, INC. – Mindanao (Base 6)
Project
Scope: Rehabilitation of main circuit breaker and feeder wires at ATS. Supply
of labor, tools, equipment and consumables for the following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Dismantling of existing MCB panel
4.Installation of new MDP panel
5.Installation of conduit pipes form MDP
(located at concrete pedestal) to ATS (inside store).
6.Installation of feeder wires from MDP to
ATS
7.Tapping of ACCU feeder wires to MDP
branch circuit
8.Testing and commissioning.
Date
Started: February
2013
WILCON
BUILDER’S DEPOT, INC. – Baliuag,
Bulacan
Project
Scope: Supply of low voltage switchgear,
automatic transfer switch, panelboards,
busbar/wire
gutter
WILCON BUILDER’S DEPOT, INC. – Libis
4th Floor, Quezon City
Project
Scope: Supply of labor, tools, equipment and consumables for the following
scope of works:
1.Mobilization
/ demobilization
2.Engineering
and technical supervision
3.Dismantling
of existing power and lighting layouts
4.Installation
of power and lightings for maintenance office.
5.Installation
of lightings at free area
6.Installation
of wire ways for maintenance office feeder line
7.Testing
and commissioning
Date
Started: March
2013
WILCON
BUILDER’S
DEPOT, INC. – Alimall,
Cubao,
Quezon City
Project
Scope: Renovation at DIY – Electrical Works. Supply of labor, tools, equipment
and consumables for the following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Electrical works:
3.1.
Dismantling works of tubular, hanger & supports, T8 lights-36W & 3.5mm²
THHN copper
3.2.
General lightings, Philips and Ariston modules
3.3.
Testing and commissioning
3.4.
As-built plan
Date
Started: June 2013
WILCON
BUILDER’S DEPOT, INC. – Halang,
Calamba,
Laguna
Project
Scope: D.I.Y Renovation
Date
Started: June,
2013
WILCON
BUILDER’S DEPOT, INC. – Filinvest,
Alabang
Muntinlupa
Project
Scope: Renovation – Electrical Works. Supply of labor, tools, equipment and
consumables for the following works:
1.Mobilization / demobilization.
2.Technical supervision.
3.Electrical works:
3.1.
Relocation of chandelier
3.2.
Replacement of racking lights
3.3.
Appliance center
3.4.
As-built plan
Date
Started: June 2013
WILCON
BUILDER’S
DEPOT, INC. – WTB Mansion
Project
Scope: Electrical at Main House. Supply of labor, tools and consumables for the
following works:
1.Mobilization / demobilization.
2.Engineering & technical supervision.
3.Electrical works:
3.1.
Dismantle and replacement of lighting fixture
3.2.
Dismantle and replacement of switches & convenience outlets
3.3.
Testing and power-up fire alarm system
3.4.
Inspection and testing of CATV system and basement, recreation area, gazebo
area, second floor and attic
3.5.
Dismantle of feeder wires for ACCU unit, guest house and office
3.6.
Dismantle of path lights and re-tracing of existing wires
3.7.
Dismantle of wires of 2 – generator set
at basement area
3.8.
Testing and commissioning
3.9.
As-built plan
Date
Started: July 2013
WILCON
BUILDER’S
DEPOT, INC. – HOME ESSENTIAL (Sta. Mesa, Piña
Avenue)
Supply of labor, tools, equipment
and consumables for the following scope of works:
1.Mobilization/ demobilization.
2.Engineering & Technical
Supervision
3.Electrical works:
A.Service Entrance Feeder and Sub
Feeder
B.Painting Works For Feeder & Sub
Feeder
C.Lighting Layout For Showrooms,
Admin Office, CCTV
D.Power Layout For Showrooms, Admin
Office, CCTV
E.Installation of Vertical Support At
First Floor
F.Installation of Wireway At First Floor
G.Installation of Vertical Support
for Lighting Fixture at First Floor
H.Installation of Horizontal &
Vertical Support at Second Floor
I.Installation of Wireway at Second Floor
J.Installation of Vertical Support
For Lighting Fixture at Second Floor
K.Roughing-ins For Racking, Ads Frame
and Build-up Letter
Date Started: July
2013
WILCON
BUILDER’S
DEPOT, INC. – Batangas
City
Project
Scope: Supply of labor, equipment, consumables & technical supervision for
the following scope of works
1.Mobilization / demobilization.
2.Roughing-ins at Training Module, Sanitary
Showroom, Service Fascia, Tenants Display, Sales Area, Releasing Area, Customer
Area and Training Area.
3.Wiring Lay-out at Training Module,
Sanitary Showroom, Service Fascia, Tenants Display, Sales Area, Releasing Area,
Customer Area and Training Area.
4.Installation of Wiring Devices at Sales
Area, Releasing Area and Customer Service Area.
5.Installation of Lightings at Training
Modules, Sanitary Showroom, Service Fascia, Tenants Display Area and Trading
Area
6.Dismantling Works for Existing C.O. Wires
and Conduits at Sales Area, Releasing & Customer Service Area
7.Dismantling Works for Existing High Bay
Lights with chain supports at Trading Area.
8.Testing and commissioning
Date
Started: October
2013
CASA
DE NIPA (LOCSIN RESIDENCE) – Brgy.
Canlubang,
Calamba
City, Laguna
Project
Scope: Supply of labor, equipment, consumables & technical supervision for
the restoration of power utilities.
Date
Started: July
2014
Contact us:
Email add: rhinotechcorp@gmail.com
Telephone No: (049) 508-0755
CP: 0917-5917-136