On-going Projects



ALASKA MILK CORPORATION
San Pedro, Laguna
Project Scope: 1.) Installation of Utilities Electrical Distribution
                          a.) Supply, installation, testing and commissioning of MV and LV feeder cables and accessories.
                          b.) Dismantling of existing MV cables and accessories.
                          c.) Supply and installation, testing and commissioning of 100kVA, 460/230V, 3phase, Dry Type Transformer.
                          d.) Supply, installation, testing and commissioning of PP-Submersible Pumps (Panelboard).
                     2.) Supply of Labor, Materials, Tools, Equipment, Supervision and Technical Know-how for the following projects.
                          a.) Installation of power distribution cable and cable trays for the electrical loads under MDP-L3-UPS and MDP-L3.
                          b.) Re-routing of existing cable supplying warehouse, maintenance and NDC project office.
                     3.) Electrical Distribution Phase 2
                          a.) Supply, installation, testing and commissioning of (1) – 250kVA Dry Type Transformer and Low Voltage Feeder cables.
                          b.) Supply and installation of cable ladder trays and positioning of distribution panelboards.
                          c.) Supply, installation, testing and commissioning for Electrical distribution on Admin Refrigeration1 & 2, Distribution Center, Staff House, MCC-D Pumps and ACCU loads.

March 2015- Present


NORTHPOINT, INC. (NORTHPOINT COOK PLANT)
Luis St. San Miguel, Pasig City
Project Scope: 1.) Supply and Installation of Electrical Substation for STAM 2
                          a.) 2 units – 2MVA Step-down Pad-mounted Transformer 34.5KV-400Y/230V
                          b.) 2 units – 34.5kV High Voltage Switchgear with load input each 2MVA capacity.
                          c.) 1 unit – First Private Pole concrete pole, complete with the required load break switch, 34.5kv, gang operated;
                               lightning arrester, power fuse, steel cross-arm, pin & suspension insulator, strain clamps; xlpe cable holder,
                               terminating kit, pole accessories; ground wire; grounding mat.
                          d.) Grounding System
                          e.) Supply and installation of 34.5kV XLPE Power Cables serving from Meralco to First Private Pole; First Private Pole
                               to HVSG ; HVSG to Transformer.

October 2015- Present


CDO FOODSPHERE, INC.
560 West Service Road, Paso de Blas, Valenzuela City
Project Scope: Supply and Installation of LED Lighting and Electrical Wirings for Alkar.
                     Substation, Transformer Station, and Powerhouse Electrical Installation (FPM Expansion Project)

October 2015-Present


KINPO ELECTRONICS INC.
FPIP STA. ANASTACIA STO TOMAS BATANGAS
Project Scope: 1. Supply and Installation of Cable Tray Ladders and Supports
                     2. Mounting/Positioning of Primary Transformers/MVSGs/LVSGs and Distribution Panels
                     3. Cable Pulling and Termination of wires from MVSG to Distribution Panels
                     4. Testing and Commisioning

May 2016-Present

NISHIYAMA-FPIP
FPIP STA. ANASTACIA STO TOMAS BATANGAS
Project Scope: 1. Supply and Installatin of 34.5Kv Metering  for Nishiyama

June 2016-Present