ALASKA MILK CORPORATION
San
Pedro, Laguna
Project Scope: 1.) Installation of Utilities
Electrical Distribution
a.) Supply,
installation, testing and commissioning of MV and LV feeder cables and
accessories.
b.) Dismantling of
existing MV cables and accessories.
c.) Supply and
installation, testing and commissioning of 100kVA, 460/230V, 3phase, Dry Type Transformer.
d.) Supply,
installation, testing and commissioning of PP-Submersible Pumps (Panelboard).
2.) Supply of Labor,
Materials, Tools, Equipment, Supervision and Technical Know-how for the
following projects.
a.) Installation of
power distribution cable and cable trays for the electrical loads under
MDP-L3-UPS and MDP-L3.
b.) Re-routing of
existing cable supplying warehouse, maintenance and NDC project office.
3.) Electrical
Distribution Phase 2
a.) Supply,
installation, testing and commissioning of (1) – 250kVA Dry Type Transformer
and Low Voltage Feeder cables.
b.) Supply and
installation of cable ladder trays and positioning of distribution panelboards.
c.) Supply,
installation, testing and commissioning for Electrical distribution on Admin
Refrigeration1 & 2, Distribution Center, Staff
House, MCC-D Pumps and ACCU loads.
March 2015- Present
NORTHPOINT,
INC. (NORTHPOINT COOK PLANT)
Luis
St. San Miguel, Pasig City
Project
Scope:
1.) Supply and Installation of Electrical Substation for STAM 2
a.) 2 units – 2MVA
Step-down Pad-mounted Transformer 34.5KV-400Y/230V
b.) 2 units – 34.5kV
High Voltage Switchgear with load input each 2MVA capacity.
c.) 1 unit – First
Private Pole concrete pole, complete with the required load break switch,
34.5kv, gang operated;
lightning
arrester, power fuse, steel cross-arm, pin & suspension insulator, strain
clamps; xlpe
cable holder,
terminating kit,
pole accessories; ground wire; grounding mat.
d.) Grounding System
e.) Supply and
installation of 34.5kV XLPE Power Cables serving from Meralco
to First Private Pole; First Private Pole
to HVSG ; HVSG to
Transformer.
October 2015- Present
CDO
FOODSPHERE, INC.
560
West Service Road, Paso de Blas, Valenzuela City
Project
Scope:
Supply
and Installation of LED Lighting and Electrical Wirings for Alkar.
Substation, Transformer
Station, and Powerhouse Electrical Installation (FPM Expansion Project)
October 2015-Present
KINPO ELECTRONICS INC.
FPIP STA. ANASTACIA STO TOMAS BATANGAS
Project Scope: 1. Supply and Installation of Cable Tray Ladders and Supports
2. Mounting/Positioning of Primary Transformers/MVSGs/LVSGs and Distribution Panels
3. Cable Pulling and Termination of wires from MVSG to Distribution Panels
4. Testing and Commisioning
May 2016-Present
NISHIYAMA-FPIP
FPIP STA. ANASTACIA STO TOMAS BATANGAS
Project Scope: 1. Supply and Installatin of 34.5Kv Metering for Nishiyama
June 2016-Present